Customization: | Available |
---|---|
Type: | Battery Terminal |
Material: | Copper |
Still deciding? Get samples of US$ 0.1/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Copper battery terminals stamping mafactering
Fabrication Service | Stamping / Punching, Bending, Welding, Laser Cutting, Sheet Metal, etc |
Other Type | Rapid Prototyping, Etching / Chemical Machining, Laser Machining, Broaching, Wire EDM, Milling, Turning, Drilling |
Tooling/Molding | Continuous Mold, Single Mold |
OEM & ODM, Standard or Non-Standard |
Available, Customization, Non-Standard |
Drawing Format Required | Auto CAD(IGS, STP, STL and X-T), DWG, PDF, Pro/Engineer, SolidWorks, etc |
Materials | Spring Steel, Stainless Steel, Brass, etc |
Thickness | 0.3 -1.2 mm |
Surface Finish | Heat Treatment, Plating, Degreasing, Electrophoresis, etc |
Tolarence Control | +/- 0.03 ~ +/-0.05 mm |
Certificates | ISO 9001:2015, IATF 16949:2016, PPAP, ROHS, BV, CCC, etc |
Sample Time | 5 -7 Days |
Supply Capacity | 600,000pcs ~ 800,000pcs / Week |
MOQ | Accept 1pcs sample |
MP Lead Time |
15 - 20 days |
Inspection | 100% Inspection |
Fabriction Service Experience | More Than 26 years |
Project Solutions For |
[Successfully Passed Factory Inspections of Many Well-Known Companies] |
Jun Ping Ju | Owner | 18+ years in metal parts fabrication engineering experience | |
Ivy Ding | Vice president | 10+ years in metal parts fabrication. Specialized PMC scheduling | |
Jian Lu | Engineering Manager | 12+ years engineering experience in metal fabrication | |
Tina Lin | PM Manager | 8+ years PM experiece in metal parts projects | |
Ruitian Huang | Quotation Engineer | 15+ years in metal parts cost analysing. Specialized in tooling and products cost optimizing |
FAQ
A: This is the 6th from startup of this commpany and the 10th year listed in offical system. You are welcomed to require any profile of this company from offical.
A: We deserve a sample try based on our past successful project experience
A: Our costing is based on material/labor/overall/profit. We are well managed factory. No middleman cost added.
A: Generally it is 5-10 days for samples and15-20 days after molding or sample confirmed.
A: We are a team full of experience with worldwide customers. You dont feel worry about your project management and the logistics.
If you have any other question, please feel free to contact us!