Customization: | Available |
---|---|
Type: | Cold Stamping |
Processing Type: | Shaping Metal |
Still deciding? Get samples of US$ 1/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
PRODUCT RANGE | Metal stamping parts, welding parts, drawing parts, metal punch parts, CNC metal parts, Metal chassis, metal cabinets, metal cases, metal enclosures, metallic auto parts,sheet metal parts, OEM mold design and fabrication |
MATERIAL AVAILABLE | Carbon steel (CRS/SPCC, SECC,etc),stainless steel, spring steel, Bronze (berylium, phosphor, etc), brass, copper , aluminum alloy. |
FINISH | Zinc/nickel/chrome/tin plating(coloring or natural), galvanization, anodizing, oil spraying, powder coating, polishing, passivate, brush, wire drawing, etc. |
ENGINEERING TOLERANCE | +/- 0.03-0.05mm |
PROCESSING | Stamping mould, continuous mold, stamping , tooling making, samples approval, CNC cutting, welding, bending and forming, finishing, assembly |
Tolerance | Stamping parts:0.01-0.1mm, CNC machining parts:0.1-0.002mm |
OEM & ODM, Standard or Non-Standard |
Available, Customization, Non-Standard |
Drawing Format Required | Auto CAD(IGS, STP, STL and X-T), DWG, PDF, Pro/Engineer, SolidWorks, |
Tooling/Molding | Continuous Mold, Single Mold |
Fabrication Service | Stamping / Punching, Bending, Welding, Laser Cutting, Sheet Metal, etc |
Sample Time | 5 -7 Days |
Supply Capacity | 600,000pcs ~ 800,000pcs / Week |
MOQ | Accept 1pcs sample |
The Team
Jun Ping Ju | Owner | 18+ years in metal parts fabrication engineering experience | |
Ivy Ding | Vice president | 10+ years in metal parts fabrication. Specialized PMC scheduling | |
Jian Lu | Engineering Manager | 12+ years engineering experience in metal fabrication | |
Tina Lin | PM Manager | 8+ years PM experiece in metal parts projects | |
Ruitian Huang | Quotation Engineer | 15+ years in metal parts cost analysing. Specialized in tooling and products cost optimizing |
FAQ
A: We deserve a sample try based on our past successful project experience
A: Our costing is based on material/labor/overall/profit. We are well managed factory. No middleman cost added.
A: Generally it is 5-10 days for samples and15-20 days after molding or sample confirmed.
A: We are a team full of experience with worldwide customers. You dont feel worry about your project management and the logistics.
If you have any other question, please feel free to contact us!